FLOWBACK PHASE DESANDING SOLUTIONS

CONTINUOUS DESANDING WITHOUT WELL FLOW INTERRUPTION

Sand can be emptied within 15 minutes without interrupting well flow or going on bypass. Our cost effective sand separation technology improves well efficiency and productivity.

HIGH-FLOW DESANDING SOLUTIONS 

Two-Stage Desanders Support Continuous Well Flow

Well efficiency is critical in a price competitive environment. Our two-stage desanders are continuously desanding with no need to interrupt well flow or go on bypass.

Easy operation & emptying

The containment sphere can be emptied in less than 15 minutes by simply opening one valve.

Unloaded on site without requiring cranes or lifting devices

Because of our robust skid design, a deck truck or truck with a deck trailer can easily load or off-load the units.

THREE MODELS SUITED FOR DIFFERENT WELL CONDITIONS

1500# ANSI SegreTECH Desander

1500# ANSI

  • MAWP: 25.5 MPa (3,700 psi)
  • Sphere ID: 48″
  • Sphere Volume: 950L (250 gal)
  • Sand Capacity: 1,350 Kg (3000 lbs)
  • MDMT: -40/300 F
  • AB Sour
5000 psi SegreTECH Desander

5000 PSI

  • MAWP: 34.4 MPa (5,000 psi)
  • Sphere ID: 48″
  • Sphere Volume: 950L (250 gal)
  • Sand Capacity: 1,350 Kg (3000 lbs)
  • MDMT: -40/300 F
  • AB Sour
2500# ANSI SegreTECH Desander

2500# ANSI

  • MAWP: 37.5 MPa (5,441 psi)
  • Sphere ID: 48″
  • Sphere Volume: 950L (250 gal)
  • Sand Capacity: 1,350 Kg (3000 lbs)
  • MDMT: -40/300 F
  • AB Sour

FLOWBACK PHASE DESANDING

SegreTECH’s Patent-Pending Technology Improves Well Efficiency

sand separators engineered for safety

Excellent Customer Support

SegreTECH understands that oil and gas wells do not operate on a regular 9 – 5 business day. We are available for support 24 hours a day, 7 days a week.

operating regions

Training & Operational Support

SegreTECH recommends that a member of our field operation crew be on site for every new customer start-up. If that is not feasible, online training is also available.

our desanders

Cost-Effective Desanding

Our rental rates are among the lowest in the industry and if you consider that you get two spheres for the price of one, the value can not be beat.

High Performance Desanders for Every Well Phase

flowback phase

Flowback Phase

During the flowback phase, well head pressures, liquid volumes and sand production levels are typically higher. Our quick de-sanding process, without well shut-in, ensures that wells do not get plugged off while on flowback.

early production

Early Production Phase

During early production, volumes of liquid and sand start to taper off but significant sand volume events are still possible. The large capacity of our patented dual sphere setup allows operators to empty the units less frequently.

steady-state production

Steady-State Phase

After initial production, the well goes into steady state production which typically means much less sand. Our optional remote monitor system allows customers to see how much sand is being produced without having to visit the wellsite.

READY TO GET EXCITED ABOUT SAND?