FLOWBACK PHASE DESANDING SOLUTIONS
CONTINUOUS DESANDING WITHOUT WELL FLOW INTERRUPTION
Sand can be emptied within 15 minutes without interrupting well flow or going on bypass. Our cost effective sand separation technology improves well efficiency and productivity.
HIGH-FLOW DESANDING SOLUTIONS
Two-Stage Desanders Support Continuous Well Flow
Well efficiency is critical in a price competitive environment. Our two-stage desanders are continuously desanding with no need to interrupt well flow or go on bypass.
Easy operation & emptying
The containment sphere can be emptied in less than 15 minutes by simply opening one valve.
Unloaded on site without requiring cranes or lifting devices
Because of our robust skid design, a deck truck or truck with a deck trailer can easily load or off-load the units.
THREE MODELS SUITED FOR DIFFERENT WELL CONDITIONS

1500# ANSI
- MAWP: 25.5 MPa (3,700 psi)
- Sphere ID: 48″
- Sphere Volume: 950L (250 gal)
- Sand Capacity: 1,350 Kg (3000 lbs)
- MDMT: -40/300 F
- AB Sour

5000 PSI
- MAWP: 34.4 MPa (5,000 psi)
- Sphere ID: 48″
- Sphere Volume: 950L (250 gal)
- Sand Capacity: 1,350 Kg (3000 lbs)
- MDMT: -40/300 F
- AB Sour

2500# ANSI
- MAWP: 37.5 MPa (5,441 psi)
- Sphere ID: 48″
- Sphere Volume: 950L (250 gal)
- Sand Capacity: 1,350 Kg (3000 lbs)
- MDMT: -40/300 F
- AB Sour
FLOWBACK PHASE DESANDING
SegreTECH’s Patent-Pending Technology Improves Well Efficiency

Excellent Customer Support
SegreTECH understands that oil and gas wells do not operate on a regular 9 – 5 business day. We are available for support 24 hours a day, 7 days a week.

Training & Operational Support
SegreTECH recommends that a member of our field operation crew be on site for every new customer start-up. If that is not feasible, online training is also available.

Cost-Effective Desanding
Our rental rates are among the lowest in the industry and if you consider that you get two spheres for the price of one, the value can not be beat.
High Performance Desanders for Every Well Phase

Flowback Phase
During the flowback phase, well head pressures, liquid volumes and sand production levels are typically higher. Our quick de-sanding process, without well shut-in, ensures that wells do not get plugged off while on flowback.

Early Production Phase
During early production, volumes of liquid and sand start to taper off but significant sand volume events are still possible. The large capacity of our patented dual sphere setup allows operators to empty the units less frequently.

Steady-State Phase
After initial production, the well goes into steady state production which typically means much less sand. Our optional remote monitor system allows customers to see how much sand is being produced without having to visit the wellsite.